Maintenance Of PDC Drill Bits For Geological Exploration

Jan 07, 2025

Leave a message

‌Regular inspection and replacement of cutting teeth‌: Regularly inspect the cutting teeth of the drill bit and evaluate their degree of wear. Once the cutting teeth are found to be damaged or excessively worn, the polycrystalline diamond composite sheet should be replaced in time to maintain the cutting efficiency of the drill bit‌.

‌Ensure the performance of the drilling fluid‌: The performance of the drilling fluid has a significant impact on the service life and performance of the drill bit. It is necessary to ensure that the drilling fluid has appropriate viscosity and rheological properties to effectively cool the drill bit, carry cuttings, and clean the bottom of the hole.

‌Optimize drilling parameters‌: Reasonable control of drilling pressure and speed can not only increase the drilling speed, but also reduce the impact and wear on the drill bit, thereby extending its service life. Excessive drilling pressure or improper speed may cause premature failure of the drill bit.

‌Avoid high temperature and welding problems‌: PDC drill teeth are prone to failure at high temperatures, especially in dry drilling construction or when the drill bit water channel is blocked. Excessive bottom hole temperature will cause the solder to melt and cause the PDC drill teeth to fall off. Therefore, water drilling should be used as much as possible to avoid dry drilling and ensure that the drill bit has unobstructed water channels.
‌Choose the appropriate drill bit type‌: Choose the appropriate PDC drill bit type according to the geological conditions. For example, hard formations require drill bits with good wear resistance, while soft formations require drill bits with strong cutting forc.
‌Bottom cleaning and running-in process‌: Before the drill bit is lowered into the well, ensure that the bottom of the well is clean and free of metal debris. When the drill bit is just lowered into the well, low drilling pressure and low speed running-in should be used, and normal drilling should be resumed after the bottom of the well is formed. ‌